inspection readiness checklist

odysseyep3
Posts: 9
Joined: Mon Oct 25, 2010 5:23 am

inspection readiness checklist

Post by odysseyep3 »

how long after resetting the check engine light should you drive should you need to drive before going in and getting an inspection. i have seen anywhere between 40 and 300 miles before i have 14 out of the 17 readiness checklist items that would let me pass inspection. any ideas?
User avatar
Waffles
Posts: 6876
Joined: Mon Dec 11, 2006 3:45 am

inspection readiness checklist

Post by Waffles »

Its not based on mileage for a ODBII ecu, you need to do some basic stuff to get the ECU to be ready. I have the list for GM here, not sure on honda.



1. Cold Start. In order to be classified as a cold start the engine coolant temperature must be below 122°F (50°C) and within 11°F (6°C) of the ambient air temperature at startup. Do not leave the key in prior to the cold start or the heated oxygen sensor diagnostic may not run.
2. Idle. The engine must be run for two and a half minutes with the air conditioner on and rear defroster on. The more electrical load you can apply the better. This will test the O2 heater, Passive Air, Purge "No Flow", Misfire, and - if closed loop is achieved- Fuel Trim.
3. Accelerate. Turn off the air conditioner and all the other loads and apply half throttle until 55mph (88km/hr) is reached. During this time the Misfire, Fuel Trim, and Purge Flow diagnostics will be performed.
4. Hold Steady Speed. Hold a steady speed of 55mph (88km/hr) for 3 minutes. During this time the O2 response, air Intrusive, EGR, Purge, Misfire, and Fuel Trim diagnostics will be performed.
5. Decelerate. Let off the accelerator pedal. Do not shift, touch the brake or clutch. It is important to let the vehicle coast along gradually slowing down to 20 mph (32km/hr). During this time the EGR, Purge and Fuel Trim diagnostics will be performed.
6. Accelerate. Accelerate at 3/4 throttle until 55-60mph (88-96 km/hr). This will perform the same diagnostics as in step 3.
7. Hold Steady Speed. Hold a steady speed of 55mph (88km/hr) for five minutes. During this time, in addition to the diagnostics performed in step 4, the catalyst monitor diagnostics will be performed. If the catalyst is marginal or the battery has been disconnected, it may take 5 complete driving cycles to determine the state of the catalyst.
8. Decelerate. This will perform the same diagnostics as in step 5. Again, don't press the clutch or brakes or shift gears.
Image
odysseyep3
Posts: 9
Joined: Mon Oct 25, 2010 5:23 am

inspection readiness checklist

Post by odysseyep3 »

dang bub. thanks. ill try that. i cruised wild horse creek at a fair pace so maybe that did a little bit as well.
User avatar
Thatoneguy
Posts: 639
Joined: Fri Aug 15, 2008 4:53 am

inspection readiness checklist

Post by Thatoneguy »

most basic scan tools that auto parts stores have will read readiness monitors. That way you know if they're all set.